Thermit Welding (GB) is happy to present the ETW 2 Insulated Bolted Joint within our product range.
The ETW 2 is designed specifically for easy assembly on site, and has proven its self over many years of use. The ETW 2 is ideal for determining train position, for the purpose of safe signal control, on a wide variety of common rail profiles. This makes it ideal for a standard rail solution.
Benefits
- Versatile: offered for all basic rail profile types
- Proven solution: successfully and dependably installed for years
Features
- Possibility of use till track velocity 250 km/h
- Using fishplates in variants with 4 or 6 holes
- Possibility of rail ends hardening in joint area
- Tested according to WG 18 / DG 11 (Mechanical requirements for joints in running rails)
- Geometric values protocol issued for each piece